STAKEHOLDER PRIORITIES
Principal:
- Cover doors to reduce ponding during rain events.
- New concrete door stops on the exterior side.
- Better door-swing control during windy days.
Based on survey results and Listening Session discussions in May and September 2021.
Teachers & Staff:
- Playfields, track and hardcourts need some upkeep and shade added.
- Add specialized classrooms for electives (music, art, science, etc.).
- Add outdoor learning spaces.
Based on online survey results from May 2021.
Students:
- Blacktop and playgrounds could be expanded,
- Add an indoor gym and locker rooms.
- Add restrooms.
Based on online survey results from May 2021.
SITE USE AND FUNCTIONALITY
General Education Classrooms
- Classrooms are in great shape. Some entry doors do not have an overhead cover which causes issues during rain season. There is also an issue with wind and entry doors. There is a need for a more permanent door stop.
Special Education Classrooms
- Currently no dedicated space for SDC.
Student Services / Counseling
- Student services are adjacent to one another in a dedicated space that also serves as the library. The space is large enough to allow students to gather in small groups, spread about the space, and still offer privacy to those seeking counseling or other services.
- This has been operating very well for the school and has no complaints or concerns.
Staff and Administrative Spaces
- Space works very well for staff and fulfills all operational needs.
Kitchen / Cafeteria / Food Service
- The multi-purpose building has just finished construction and offers a preparation kitchen, plenty of indoor seating, and prescribed food service circulation. Before the construction, students would eat outside. This practice will continue when wanted, but now has increased flexibility due to large doors that allow the multi-purpose space to bleed into the landscape.